Added to comparisons. Check added properties.

Koszykowa 54 - attractive offices for rent

Attractive office space on Koszykowa Street

The office building Koszykowa 54 also called IPC Business Center and is one of the most characteristic office building in the area. Irregular facade of the building allows for its unambiguous identification. Construction completed in 1993 and has more than 16000 sq m usable area, of which almost 9000 sq m is designed for offices. The surface of typical floor amounts 1500 sq m. The building has 3 underground floors, on which is parking for 40 cars. The building was modernized in 2013.

  • The modern office complex is divided into parts: A and B

  • 7-story building

  • Three-level underground garage

  • Individual parts of the IPC Business Center complex have separate entrances with reception desks and elevators

  • The building at Koszykowa 54 ensures security and control over persons entering the building using reception desk, security, and access control

  • The office building is equipped with BMS, air-conditioning, tilt windows, and fibre optic cables.

Location

Location of the office building in the center of Warsaw; The office building is surrounded by the streets: Piękna, Lwowska, and Koszykowa; The location between the stations of the first metro line: Metro Centrum and Metro Politechnika Convenient location - many bus lines and tram In the vicinity of the building, there are present restaurants, cafes, and eating places.

Technical data

  • Number of buildings
    1
  • Building class
    A
  • Number of underground levels
    3
  • Number of ground floors
    8
  • Space of ​​a typical floor (sq m)
    1 500
  • High (m)
  • Reception
    YES
  • BMS
    YES
  • Heat sensors
    NO
  • Smoke detectors
    YES
  • Air conditioning
    YES
  • Open windows
    NO
  • Raised floor
    NO
  • Controlled access
    YES
  • Security service
    YES
  • Monitoring
    YES
  • Two independent power sources
    YES
  • Certificates
    NO
  • Offer ID
    bb9896

Distances

Przystanek autobusowy/tramwajowy
Metro Politechnika
Hotel (*****)
Dworzec Centralny
Lotnisko Chopina

Market data

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
more offers
more offers
more offers

The most searched phrases