Added to comparisons. Check added properties.

The building consists of two ground independent parts. The construction was completed in 2003. The property is also called PAP. Its facade is made of various types of sandstone, referring to the surrounding historic buildings. The total area of the building amounts 13000 sq m of which over 5000 sq m are designed for office space. Typical floor area amounts 750 sq m. The building has 8 storeys above ground and 2 underground floors with 50 parking spaces for cars.

  • Modern, 9-storey office building

  • The building has 2 independent parts for lease

  • Number of office floors: 7

  • Building completion date: 2003

  • Parking ratio: 1/100.

Location

The building is located in Srodmiescie district at Mysia street, near to Trzech Krzyzy Square ; In close proximity there are Sheraton hotel, The Warsaw Stock Exchange, and governmental institution; The location provides good transport facilities and easy access to the city centre.

Technical data

  • Number of buildings
    1
  • Building class
    A
  • Number of underground levels
    2
  • Number of ground floors
    8
  • Space of ​​a typical floor (sq m)
    750
  • High (m)
  • Reception
    YES
  • BMS
    YES
  • Heat sensors
    NO
  • Smoke detectors
    YES
  • Air conditioning
    YES
  • Open windows
    YES
  • Raised floor
    YES
  • Controlled access
    YES
  • Security service
    YES
  • Monitoring
    YES
  • Two independent power sources
    YES
  • Certificates
    NO
  • Close to the metro station
    YES
  • Offer ID
    bb9901

Distances

Dworzec Centralny
Metro Centrum
Lotnisko Chopina

Market data

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
more offers
more offers
more offers

The most searched phrases