AXI IMMO / Offices / mazowieckie / Warszawa / Wola /
City Gate – office in Warsaw’s Wola district
Office in Warsaw's Wola district
City Gate is a property offering approx. 25,000 sqm. of office and retail space. The facility consists of 14 ground and 2 underground floors, where there are over 200 parking places for tenants. Flexible division provides the ability to adjust the surface for both large and small tenants. The offices are equipped with air conditioning, structural cabling, suspended ceiling, openable windows, carpeting, access control and optical fiber. Additional amenities include: a conference rooms, an ATM, a cafeteria, newsagent, car wash, bank, dry cleaning service and a restaurant.
A modern office building commissioned in 2000 and maintained in accordance with the highest technical and technological requirements
A 14-storey building with an average floor area of 1 400 sq m
233 underground parking spaces with a ratio of 1: 100
The office building is equipped with such amenities as air-conditioning, tilt windows, suspended ceilings, carpeting
Available to tenants: a fully equipped conference room
Location
Location at the intersection of Okopowa and Towarowa streets from Solidarności Avenue; Convenient access to the facility both by public transport and by car; Very good access from the western side of Warsaw; Communication connection with tram and bus lines; About 10 minutes from the station of the first metro line.
Technical data
- Number of buildings1
- Building classA
- Number of underground levels2
- Number of ground floors14
- Space of a typical floor (sq m)500 - 1400
- High (m)
- ReceptionYES
- BMSYES
- Heat sensorsYES
- Smoke detectorsYES
- Air conditioningYES
- Open windowsYES
- Raised floorNO
- Controlled accessYES
- Security serviceYES
- MonitoringYES
- Two independent power sourcesYES
- CertificatesNO
- Offer IDbb9218
Distances
Market data
In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.
At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.
In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.
Contact
Bartosz Oleksak
Associate Director Office Department
Contact
Jakub Potocki
Associate Director Office Department