AXI IMMO / Warehouses / Warszawa / Nadarzyn /
For rent a warehouse with racks and mezzanines, Kajetany near Nadarzyn
For rent a warehouse with racks and mezzanines, Kajetany near Nadarzyn
Platinet Logistics Center offers to rent a warehouse with high storage racks and multi-level mezzanines on the equipment. It is a high warehouse with an area of 12,000 sq m, which has a reinforced floor with a capacity of 15 tons / sq m. Thanks to this solution, high racks and multi-level mezzanines have been placed on the surface. Thanks to a large number of gates, it is possible to quickly unload and load goods, because the warehouse has 8 docks and 9 gates from the ‘0’ level.
Certainly, the distinguishing feature of this property is the intimate character of the detached object. Above all the greatest asset is its internal storage infrastructure, such as racks and multi-level mezzanines. The greatness of the real estate is also affected by large parking lots as well as the location itself. Of particular note is the possibility of expansion by nearly 30,000 sq m.
Platinet Logistics Center has a separate, 3-storey office building offering nearly 3,000 sq m. attractive space for rent.
-
Warehouse with racks
-
high storage racks
-
Multi-level mezzanines
-
8 unloading docks
-
9 gates from zero level
-
The warehouse has a reinforced floor with a load capacity of 15 tons / sq m. The large, back-lit car park offers nearly 200 parking spaces for passenger cars and a wide manoeuvring area. A separate, 3-storey office building with office space for rent
-
Heated surface
-
Warehouse height: 10m
-
Ventilation
-
Skylights
-
Sprinkler installations
-
Monitoring
-
The property offers the possibility of expansion of warehouse and office space by nearly 30,000 sq m. in the neighbouring area, which currently has a building permit.
Location
Platinet Logistics Center is located in Kajetany, in the municipality of Nadarzyn. The logistics centre is located near the Nadarzyn link to the S8 junction, the Nadarzyn junction on the S8 route is the entry to the S8 expressway (Wrocław – Białystok). The S8 road is an important transport connection, which in the future will be a part of the international road E67 (Via Baltica). The Center is located about 23 km southwest of the centre of Warsaw, Approx.. 21 km from the Chopin Airport in Warsaw at Okęcie.
Technical data
-
Number of buildings2
-
Possibility of productionYES
-
CertificateNO
-
Storage height (m)10.0
-
Floor load capacity15.0
-
Column grid26 x 11,2
-
Railway sidingNO
-
Fire resistance-
-
DocksYES
-
Ground level access doorsYES
-
Cold store/freezerNO
-
Minimal space (sq m)15070
-
Roof SkylightsYES
-
SprinklersYES
-
MonitoringYES
-
SecurityYES
-
Offer IDmp11058
Distances
Market data
The Mazowieckie Voivodeship is the largest warehouse market in Poland. The total warehouse and production resources of the region at the end of 2023 amounted to 31.7 million sqm with new supply for the whole of 2023 amounting to 3.7 million sqm. Mazowieckie is a central location chosen by logistics companies, distribution companies, suppliers, the e-commerce industry, and service companies. The dominant subregions are Pruszków, Ożarów Mazowiecki, Janki, Nadarzyn, Piaseczno, Marki, Radzymin, Modlin and Czosnów.
Customers appreciate the local logistics market, its excellent location surrounded by a dense network of roads and motorways, enabling comfortable transport in every direction in Poland. Tenants are eager to use key routes in the Mazowieckie region, such as the A2 motorway, the S2, and S8 expressways, and national roads 50 and 92. Gross demand in 2023 in Poland amounted to 5.6 million sqm, while for the Mazowieckie Voivodeship market it was 1.4 million sqm. Many tenants decide Mazwieckie due to the diverse and large offer of warehouse space that meets the requirements of various sectors.
At the end of 2023, the vacancy rate for the Mazwieckie region was 7.7%. Due to the largest consumer market and high liquidity, the region is chosen by major market players. Panattoni, 7R, GLP, WhiteStar, Logicor, Hillwood, CTP, MLP, Segro, Hines, Prologis, P3 and many individual entities remain active in Mazovia. At the end of 2023, developers delivered 702.5 thousand sqm, while at the same time 479 thousand sqm were under construction.
Contact
Karol Osiecki
Associate Director Industrial & Development
Contact
Paweł Bułajewski
Senior Specialist Industrial & Development